French utility seeks turbine-generator for 320-MW La Coche

Utility Electricite de France (EDF) seeks bids to supply a 240-MW turbine and generator to the 320-MW La Coche pumped-storage project that generates power from eight rivers in France's Savoie Department. Bids are due January 30.

EDF took bids in September to perform inspection and monitoring of the dam of the 11.8-MW Vieux Pre pumped-storage project in the Meurthe et Moselle Department.

The utility now seeks bids for two lots to supply the Pelton turbine and auxiliaries and to supply a 290-megavolt-ampere generator, excitation, and voltage regulation.

Tender documents may be obtained from the address below. Bids, in French, are due by 4 p.m. January 30 via EDF's procurement Internet site, http://portail-achats.edf.com.

For information, contact Delphine Lohner, Electricite de France, EDF SA, Direction des Achats, Agence Achats Hydraulique, 13 rue Jean Girard-Madoux, 73026 Chambery, France; (33) 479266805; Fax: (33) 479266803; E-mail: delphine.lohner@edf.fr; Internet: www.edf.fr, http://portail-achats.edf.com.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs