Albania seeks bids for Murriz Thana Dam rehabilitation project

Albania Map

Albania's Ministry of Agriculture, Food and Consumer Protection seeks bids for a rehabilitation project to refurbish Murriz Thana Dam in Fier/Shegan, Lushnje Fier, Albania. Bids are due July 12.

With financing from the World Bank for the Water Resources and Irrigation Project, the ministry recruited consultants in January to supervise rehabilitation and modernization of 14 dams including Murriz Thana.

In a separate program, the Albanian power corporation, Korporata Elektroenergjetike Shqiptare (KESH), pre-qualified firms in May and June to perform dam safety civil works at the 600-MW Komani hydroelectric project on Albania's Drin River. KESH also recruited consultants in April to develop a dam safety program and emergency preparedness plans for Komani and the 500-MW Fierze and 250-MW Vau i Dejes projects on the Drin.

The ministry now seeks bids for rehabilitation of Murriz Thana, which includes slope stabilization, upstream slope protection, construction of a retaining wall and reinforced concrete parapet, crest work, drainage, concrete repairs, and dam monitoring instrumentation.

Bidding documents in English may be obtained by written application to the address below for 10,000 leks (US$94) by direct deposit to Banka Kombetare Tregetare, Account No. 401481701CLTJCLALLAQ, IBAN AL 6520511014481701 CLTJCLALLA.

Bids are due by noon July 12 to Protocol Office, Ministry of Agriculture, Food and Consumer Protection, Blv. Deshmoret e Kombit, No. 2, Attn.: Albert Kushti, Head of Contracting Authority, Tirana, Albania. For information, contact Ministry of Agriculture, Food and Consumer Protection, Attn.: Project Manager Andi Vila, Tel/Fax: (355) 4-223917; E-mail: andivila@yahoo.com.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs