First Energy chooses lignum vitae turbine bearings for Luray plant

file

Lignum-Vitae North America has been awarded a contract to supply a turbine bearing for FirstEnergy’s 1.6-MW Luray plant.

One of the existing turbines in service at this plant, on the Shenandoah River in Virginia, was equipped with lignum vitae bearings that had operated for 45 years since they were installed. After experimenting with plastic bearings, FirstEnergy decided to convert the main guide bearings in this unit back to lignum vitae, Lignum-Vitae North America says.

Lignum vitae comes from a small, slow-growing tree. The wood is self-lubricating, and the bearings can be adjusted to zero clearance.

Lignum-Vitae North America has recently announced awards to supply bearings to several other hydro projects, including Alabama Power’s 12.5-MW Neely Dam and Wisconsin Public Service’s 1.7-MW Alexander Dam.

For more technology and equipment news, click here.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs