Otra Kraft awards contract for turbines, electrical work at 24-MW Skarg hydro plant

Norwegian hydro operator Otra Kraft DA has awarded a contract to Rainpower Small Hydro AS for electromechanical work at the 24-MW Skarg hydropower plant in Bykle, Norway.

Otra Kraft DA solicited bids for the work in September 2011, which includes the design, engineering, supply and installation of two 12-MW vertical Francis turbines, generators, control systems and electrical work.

The system is to be built for manual operation as well as automatic operation from a control center more than 30 km away.

The value of the contract was not specified.

Also in Norway, HydroWorld.com reported in September that the Nordic Investment Bank (NIB) has signed an agreement worth US$64.58 million with Agder Energi AS to finance increased hydroelectric.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs