BC Hydro seeks management of work on 492-MW Bridge River system

Canadian utility BC Hydro seeks bids for project management of maintenance and capital projects on the four-plant, 492-MW Bridge River generating system in British Columbia. Bids are due Oct. 10.

BC Hydro said work on the projects, on Bridge River, is to be performed on an "as, if, and when required" basis over an initial term of two years with an option for extensions up to an additional five years. Project personnel are to be site-based at or near Shalaith, B.C.

Tender information may be obtained from British Columbia's BC Bid Internet site, www.bcbid.gov.bc.ca. Bids are due by 11 a.m., Pacific time, Oct. 10.

For information, contact BC Hydro and Power Authority, Purchasing Dept., Quotations, Bid Station (Courier Desk/Main Floor), 333 Dunsmuir St., Vancouver, British Columbia V6B 5R3 Canada; (1) 604-623-4346; E-mail: bidstation@bchydro.com; Internet: www.bchydro.com; www.bcbid.gov.bc.ca.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs