Reclamation awards contract for work at Webster Dam

The U.S. Bureau of Reclamation has awarded a US$555,959 to Hartman-Walsh Painting Co. to recoat outlet metalworks at Webster Dam.

Webster Dam, part of the Pick-Sloan Missouri Basin Program, is on the South Fork of the Solomon River in Kansas.

Reclamation last solicited bids for the project in July, which includes the complete removal of existing coatings and application of a new coating system to elements including the interior and exterior of a 48-inch steel outlet pipe, handrails, ladders, slide gate bonnet cover, hydraulic hoist, cylinder head, gate hanger, hydraulic lines, bypass pipe, gate valve, ventilation piping, base plates, bearing plates, bearing shoes and related fixtures.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs