French utility seeks inspection, monitoring of Vieux Pre pumped-storage

Utility Electricite de France (EDF) seeks bids to perform inspection and monitoring of the dam of the 11.8-MW Vieux Pre pumped-storage project in the Meurthe et Moselle Department of eastern France. Bids are due September 24.

Vieux Pre Dam is a 70-meter-tall, 350-meter-long zoned embankment structure completed by EDF in 1985.

The utility seeks bids to perform periodic inspection, examination of existing monitoring equipment, flow measurements, and preparation of reports. The contract is to run for four years.

Tender documents may be obtained from the address below. Bids, in French, are due by 11 a.m. September 24. For information, contact Mathilde Burgehelle, Electricite de France, Directions des Achats, Agence Achats Hydraulique, 13 rue Jean Girard-Madoux, 73026 Chambery, France; (33) 479264926; Fax: (33) 479266803; E-mail: mathilde.burghelle@edf.fr; Internet: www.edf.fr, https://portail-achats.edf.com.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs