French firm seeks turbine components for Breda project

ANNECY, France 4/2/12 (PennWell) -- Hydropower engineer Hydrostadium seeks bids for supply of replacement parts for a 1.8-MW turbine-generator of the Breda hydroelectric project on the Breda River in France's Isere and Savoy departments. Bids are due April 16.

Hydrostadium, a subsidiary of Electricite de France, seeks a new spiral casing, Francis turbine runner, and other components for the unit, which is designed for a net head of 42.85 meters and a flow of 5 cms.

Bids, in French, are due by 2 p.m. April 16 to the address below. For information, contact Soizic Depaoli, Hydrostadium, 22 Avenue des Vieux Moulins, 74000 Annecy, France; (33) 450102522; Fax: (33) 450102526; E-mail: soizic.depaoli@hydrostadium.fr; Internet: www.hydrostadium.fr.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs