Tetra Tech to perform hydroelectric construction work for 45-MW plant

PASADENA, Calif., U.S. 9/14/11 (PennWell) - Tetra Tech Inc. was awarded a $23 million hydroelectric construction project for Rochester Gas and Electric Corp. (RG&E), a subsidiary of Iberdrola USA.

Tetra Tech will reconstruct and reinforce a water conveyance tunnel and install a new liner at RG&E’s 45-MW Station 5 run-of-river facility in Rochester, NY. RG&E’s Station 5 is located on the Genesee River, approximately 6.5 river-miles from Lake Ontario.

The Station 5 tunnel transmits screened water 1,600 feet from an impoundment area to the powerhouse and turbine generating equipment.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs