German utility seeks construction, equipment for 430-kW Halle

Municipal utility EVH GmbH, seeks bids for construction and equipment of a 430-kW hydroelectric project to be built on the city's Halle weir. Bids are due July 25.

EVH plans to build the two-unit project on the Saale River, with work to begin in January 2012 and be completed in September 2013.

EVH seeks bids for nine lots including a new powerhouse, rebuilding the city weir, construction of a new fish transfer channel, pilings and excavation, access roads and facilities, turbine-generators and other equipment, and hydraulic steelwork.

Tender documents may be obtained until noon July 15 from the address below. Bids, in German, are due by noon July 25.

For information, contact Susanne Poppe, EVH GmbH, Bornknechtstrasse 5, 06108 Halle (Saale) Germany; (49) 3455817550; Fax: (49) 3455811851; E-mail: susanne.poppe@netzhalle.de; Internet: www.evh.de.

For more hydropower tenders, click here.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs