British Columbia has released the first-annual B.C. dam safety report. The publication is one of a dozen recommendations made by the deputy solicitor general after the failure of the Testalinden Dam in June 2010.

There were five dam incidents that required action in British Columbia last year, in addition to the breach of the Testalinden dam in June that sent a wall of mud down on several homes and orchards near Oliver, B.C, the Canadian Press reported.

The Testalinden Dam likely failed because the spillway and the freeboard, the distance between the water's surface and the dam's crest, were inadequate and insufficient, the dam safety report indicates.

The breach has since been stabilized by the dam owner, according to the report.

The five remaining incidents took place at the Goertzen Pond Dam near Osyoyoos, the Grafton Lake Dam on Bowen Island, the Eagle Rock Reservoir south of Chase, the Allan Springs Reservoir in Saanich and the John Hart Dam on the Campbell River.

Dam owners were required to lower water levels, remove a beaver dam, clear a spillway of obstructions, remove vegetation and improve structural problems.

The number of dam owners who complied with reporting requirements increased to 93 percent, up from 87 percent the year before. However, those responses are inconsistent and difficult to interpret, reports indicate.

The report recommends more concise questioning in the future.

There were 99 dam safety audits last year - which falls short of the target of 113 because staff were focused on the Rapid Dam Assessment program put in place after the Testalinden mudslide.

Of B.C's 1,900 dams, about 1,200 are considered low risk.

For more hydropower news and information, click here



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs