U.S. awards outlet pipe coating contract for Shadehill Dam

The Bureau of Reclamation has awarded Washington-based Long Painting Company a contract for coating repair of a 72-inch steel outlet pipe at Shadehill Dam near Lemmon, South Dakota.

Shadehill Dam, part of the Pick-Sloan Missouri Basin Program, is a rolled earthfill structure with a crest length of 12,843 feet and a maximum height of 145 feet. It provides flood control, fish and wildlife conservation, recreation and silt detention.

Reclamation seeks removal and replacement of about 135 square feet of damaged coatings on the exterior of 72-inch-diameter steel pipe and repair of about 6,075 square feet of damaged coating on the interior of 72-inch-diameter steel pipe.

The contract is valued at $273,798.

For more hydropower news and information, click here

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs