Equipment overhaul sought for Swiss 4.5-MW Charmey

Swiss utility Gruyere Energie SA seeks bids to refurbish generating units at the 4.5-MW Charmey hydroelectric project on Switzerland's Jogne River. Bids are due June 24.

Gruyere Energie produces nearly 12 percent of its electricity from Charmey, which was built in 1893 and relocated in 1957.

The utility seeks bids to renovate and automate three generating units in three lots: Lot 1 turbines; Lot 2 generators; Lot 3 control group, automation, and pipe work.

Tender documents may be obtained from the address below. Questions may be submitted in writing through May 20. Bids, in French, are due by 11:30 a.m. June 24 in sealed envelope labeled "Projet RUCH - revision turbines-alternateurs. Do not open."

For information, contact Pierre Castella, Gruyere Energie SA, rue de l'Etang 20, 1630 Bulle, Switzerland; (41) 269192323; Fax: (41) 269192325; E-mail: office@gruyere-energie.ch; Internet: http://www.simap.ch/shabforms/servlet/web/DocumentSearch?NOTICE_NR=624477, www.gruyere-energie.ch

For more hydropower tenders, click here.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs