Equipment overhaul sought for Swiss 4.5-MW Charmey

Swiss utility Gruyere Energie SA seeks bids to refurbish generating units at the 4.5-MW Charmey hydroelectric project on Switzerland's Jogne River. Bids are due June 24.

Gruyere Energie produces nearly 12 percent of its electricity from Charmey, which was built in 1893 and relocated in 1957.

The utility seeks bids to renovate and automate three generating units in three lots: Lot 1 turbines; Lot 2 generators; Lot 3 control group, automation, and pipe work.

Tender documents may be obtained from the address below. Questions may be submitted in writing through May 20. Bids, in French, are due by 11:30 a.m. June 24 in sealed envelope labeled "Projet RUCH - revision turbines-alternateurs. Do not open."

For information, contact Pierre Castella, Gruyere Energie SA, rue de l'Etang 20, 1630 Bulle, Switzerland; (41) 269192323; Fax: (41) 269192325; E-mail: office@gruyere-energie.ch; Internet: http://www.simap.ch/shabforms/servlet/web/DocumentSearch?NOTICE_NR=624477, www.gruyere-energie.ch

For more hydropower tenders, click here.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs