New bid date for hydro-meteorology system for India reservoirs

Hydro operator Bhakra Beas Management Board (BBMB) has extended the deadline for bids to supply a hydro-meteorology system for its real-time decision support system for management of BBMB's reservoirs in India. Bids now are due January 28.

BBMB previously called for bids by December 31. In 2006, it took bids on behalf of the government of India for development of the decision support system for operational management of BBMB's reservoirs. BBMB's hydroelectric projects include 540-MW Bhakra Left, 785-MW Bhakra Right, 990-MW Dehar, 77.65-MW Ganguwal, 77.65-MW Kotla, and 396-MW Pong.

BBMB now seeks bids for supply, installation, and commissioning of a hydro-meteorological real-time data acquisition system and integration of the system with BBMB's real-time decision support system in the Sutlej and Beas basins. The contract period is 12 months.

Bidding documents in English may be obtained until 4 p.m. January 27 from the address below for 5,000 rupees (US$110) by demand draft, cashier's check, or certified check to AO/HP-II at Chandigarh. Documents will be sent by airmail or courier, or an electronic copy may be requested by e-mail to the address below after making the payment above.

Bids now are due by 3 p.m. January 28. For information, contact Director M.L. Gupta, HP-II, Bhakra Beas Management Board, 19-B Madhya Marg, Chandigarh 160019 India; (91) 172-5011773; Fax: (91) 172-2549857; E-mail: dirhp2@bbmb.nic.in, dirhp2bbmb@yahoo.com; Internet: www.bbmb.gov.in.

For more hydropower tenders, click here.



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs