Vermont wind turbine project receives updated state regulations

8. Vermont (14.34 cents per kWh)

FAIRFAX, Vt. (AP) — The Vermont Public Utility Commission is imposing new restrictions on the George Mountain Community Wind power project.

Vermont Public Radio reports residents Scott and Melodie McLane filed a complaint with the state after seeing the wind turbines operating in Fairfax with ice on their blades in violation of a state permit.

State regulators ruled that operators would have to use meteorological data to stop the blades before ice forms. Originally, regulations called for the turbines to be paused only after ice was detected.

The ruling also requires Georgia Mountain Community Wind to file a report each year, over the next five years, identifying all icing events.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs