DTE Energy wants to build $1 billion natural gas power plant

natural gas power plant july 5 elp

EAST CHINA TOWNSHIP, Mich. (AP) — DTE Energy Co. says it's seeking permission to build a nearly $1 billion, natural gas-fired power plant northeast of Detroit as the utility moves forward with plans to close coal-fired plants.

Plans announced Tuesday call for groundbreaking in 2019 in St. Clair County, where the Detroit-based utility has operated the St. Clair and Belle River coal-fired power plants for decades. The St. Clair plant is being shut down around 2020-2023.

The Michigan Public Service Commission will review the request. If approved, DTE says the gas-fired plant in East China Township will provide 1,000 MW of electricity, enough for 850,000 homes, starting in 2022.

DTE said in September that it would build a gas-fired plant in near the existing St. Clair County plants, about 45 miles from of Detroit.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs