County wants Pennsylvania prison to become power plant

prison cell elp

CRESSON, Pa. (AP) — County officials want to turn a former prison site in central Pennsylvania into a gas-fired power plant.

The former State Correctional Institution-Cresson has been transferred to the Cambria County Redevelopment Authority for $1. That's the first step in selling the 93-acre tract to a company that wants to build the plant.

Greg Cammerata, president of Greensburg-based KeyTex Energy, says the company wants to build the plant.

But before that can happen, PJM Interconnection — a company that operates the electric power grid in more than a dozen states — has to determine whether electrical substation upgrades are needed first.

The prison. about 80 miles east of Pittsburgh. closed in 2013.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs