California ISO wants to improve natural gas-electric coordination

natural gas burner elp

The California Independent System Operator board of governors approved a plan to improve gas-electric coordination and reduce the risk of electric delivery issues associated with the moratorium imposed on the Aliso Canyon natural gas storage facility.

The revised draft final proposal includes improvements to better align California ISO markets with current conditions on the gas system and to enable power plant operators to better manage their gas burns to avoid gas balancing penalties.

The ISO also proposes to reserve transmission capacity if necessary to take into consideration gas or electric system conditions, which will help ensure lines have flexible capacity margins to respond to real-time changes.

The improvements to the power market design can be quickly implemented and will help in the short term to deal with expected heavy grid use during the upcoming summer months but the ISO reported that longer term market design changes, if any, should be considered.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs