Design firm plans 110 MW solar power project in Saudi Arabia

pge solar california elp

Ci design will design and planning of a new 110 MW photovoltaic (PV) manufacturing facility for the Al-Afandi Group, the first fully integrated PV panel manufacturing facility in Saudi Arabia.

The renewable energy project will combine all stages of the PV solar panel manufacturing process within one facility, including wafer, cell and module manufacturing, to streamline production and to compete on cost in the growing solar energy marketplace.

Partnering with PV Tech Group (Winchester, Massachusetts), Avid Engineers (Boston) and DAR Engineers (Riyadh), ci design will oversee the full scope of the project, leading design efforts for the 24,800 square meter facility located in the Industrial Valley of the King Abdullah Economic City in Jeddah.

Design is set to begin in spring 2015.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs