Eaton helps modernize Green Mountain Power’s hydroelectric facility in Vermont

Power management company Eaton is helping Green Mountain Power (GMP) modernize, upgrade and automate the electrical system at its Proctor, Vermont hydroelectric plant.

Under the contract, Eaton will update the plant’s power and control systems — allowing GMP to reduce costs, enhance reliability and manage the facility remotely.

Eaton will design and install new electrical infrastructure at the century-old Proctor hydroelectric station, which currently includes five turbine-generating units that produce 6.9 MW of low carbon energy. Expected to be complete in January 2015, the modernization project includes the replacement of the excitation system, governors, turbines, control system and power distribution equipment.

With a fleet of 32 hydro stations across Vermont, GMP has one of the largest fleets of hydroelectric generating stations in New England. The facilities produce renewable energy at a fraction of the cost of most other generation sources.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs