Mitsubishi Hitachi Power Systems to build 25 MW geothermal plant in Mexico

Mitsubishi Hitachi Power Systems, Ltd. received a full turnkey order from Grupo Dragon through Geotérmica para el Desarrollo S.A.P.I de C.V., one of its power generation companies in Mexico, to build a 25-MW geothermal power plant.

MHPS received the order through its unit, Mitsubishi Hitachi Power Systems de México, S.A. de C.V. (MHPS-MEX). The power plant will be built in Domo de San Pedro, Nayarit state in midwest Mexico and is slated to go on-line in 2016.

MHPS will be responsible for engineering, manufacture, procurement and installation of major components, including the steam turbine, and balance of plant, as well as civil engineering work and commissioning.

To date, MHPS has received 12 other orders from Mexico’s Comisión Federal de Electricidad for geothermal power plants from two power stations.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs