Alberta wind farm reaches commercial operation

The 300 MW Blackspring Ridge Wind Project has reached commercial operation and is now connected to the Alberta power grid.

EDF EN Canada Inc., a unit of EDF Energies Nouvelles, and Enbridge Inc. acquired the project from Greengate Power Corp. for $5.9 million.

EDF EN Canada and Enbridge each own 50 percent of the project.

The project utilizes 166 Vestas V100-1.8 MW wind turbines. EDF EN Canada built the project under a fixed price engineering, procurement and construction contract.

Renewable energy credits (RECs) generated from the project are contracted to Pacific Gas and Electric (PG&E) under a 20-year purchase agreement.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs