Alberta wind farm reaches commercial operation

The 300 MW Blackspring Ridge Wind Project has reached commercial operation and is now connected to the Alberta power grid.

EDF EN Canada Inc., a unit of EDF Energies Nouvelles, and Enbridge Inc. acquired the project from Greengate Power Corp. for $5.9 million.

EDF EN Canada and Enbridge each own 50 percent of the project.

The project utilizes 166 Vestas V100-1.8 MW wind turbines. EDF EN Canada built the project under a fixed price engineering, procurement and construction contract.

Renewable energy credits (RECs) generated from the project are contracted to Pacific Gas and Electric (PG&E) under a 20-year purchase agreement.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs