Gamesa to equip Texas wind project with wind turbines

Gamesa will supply 202 MW of wind turbines to the Baffin wind farm project in southern Texas. The project being developed by Iberdrola will use 101 of Gamesa’s 2 MW turbines.

 

The wind turbines are scheduled for delivery in mid-2014, and the facility is slated for commissioning towards the end of 2014. The project is still under development, and the decision to proceed is contingent on local government approval. Gamesa noted in a release, however, that Iberdrola is well-positioned to use the 202 MW of turbines at other possible U.S. sites.

The Baffin wind power project is the last phase of Iberdrola’s Peñascal complex, which will have a total capacity of 606 MW when commissioned.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs