Perry Nuclear Power Plant completes emergency operations facility

Akron, Ohio, July 17, 2012 — FirstEnergy Nuclear Operating Co. (FENOC), a unit of FirstEnergy Corp., announced that construction of the emergency operations facility for its Perry Nuclear Power Plant has been completed.

The new 12,000-square-foot facility supports overall management of activities related to maintaining public health and safety during the unlikely event of an emergency at the plant. 

The facility also will be used by emergency response organizations during quarterly training drills and bi-annual exercises evaluated by the Nuclear Regulatory Commission and the Federal Emergency Management Agency to assist our preparedness to respond to an emergency.

Features of the new facility include: enhanced technologies that aid in timely monitoring and collection of environmental data; a secured, online database for sharing plant conditions and other event information in real time between company, local, county and state emergency responders; updated computer equipment; and diverse telecommunications technology to enhance communications capabilities. In addition, multiple power supplies are designed to ensure the facility will not be affected by a power failure.

Located in Concord, Ohio, the facility replaces an existing emergency operations facility located on site at the Perry plant.

FirstEnergy is a diversified energy company headquartered in Akron, Ohio. Its FENOC unit also operates the Beaver Valley Power Plant in Shippingport, Pa., and the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs