Arista Power installs first WindTamer turbine in Europe

Rochester, N.Y., Aug. 2, 2011 — Arista Power, a provider of custom-designed power management systems, renewable energy storage systems, installed the first WindTamer wind turbine in Europe.

The turbine was installed by UAB WindTamer Europe, which in April, 2011 obtained the exclusive distribution rights for WindTamer turbines and other Arista Power products in Lithuania, Latvia, Denmark, Sweden and The Netherlands.

The 8.0 GT WindTamer turbine, which is the largest of the current WindTamer turbines, was installed in Kunkiai, Lithuania, a residential community about 25 km north of Klaipeda. Klaipeda, located on the edge of the Baltic Sea, is Lithuania's seaport city and is also the location of the headquarters of UAB WindTamer.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs