Siemens invests about $43 million in Berlin gas turbine plant

Erlangen, Germany, July 21, 2011 — One of a total of six gas turbines intended for the U.S. customer Florida Power & Light is currently being put through its paces in the Siemens gas turbine manufacturing plant.

Siemens has enlarged its test bed specifically for this purpose. In addition, a new drilling station for casing parts has been installed to make production of the gas turbines even more efficient. The total investment volume adds up to $42.6 million.

More than 600 turbines from Berlin-Moabit have been delivered to date to customers all over the globe. The new turbine series — with the highest efficiency and output rating ever — is known as the H Class and is also produced in Berlin.

During a test run as part of the commissioning procedure for the Irsching 4 CCPP, Siemens recently wrote technology history by achieving an output of 578 MW (MW) and efficiency of 60.75 percent (net).

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Latest PennEnergy Jobs

PennEnergy Oil & Gas Jobs