Kenya pilots on-site power project

Cummins Power Generation is working with the Kenya Power & Lighting Company in a pilot on-site power test project at Marigat in Baringo County, Kenya.

The project is currently coming on stream, when it will produce up to 12 MW of electricity, 10 MW of which can be exported to the grid. Fuelled on biomass waste, the project is being developed by Cummins Cogeneration Kenya Ltd (Cummins CK), a joint venture with Gentec Energy.

The Baringo project is an important step for Cummins CK for long-term expansion, the company says.

Cummins CK Managing Director Yash Krishna explained: ‘Besides jump-starting the local economy by bringing employment to a marginalized population through utilization of an invasive weed, the Baringo project will also showcase the producer-gas engines developed by our parent company, Cummins Power Generation.’

A follow-up project elsewhere in Kenya will also use a combination of agricultural residues to generate power, and a 1.2 MW plant project has already begun in Zambia.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...