Geothermal district heating comes online in Hungary

Hungary’s first geothermal district heating plant is now online after an opening ceremony last week.

The $34m, 52 MWth plant at Gyor in the northeast of the country is operated by project developer PannErgy. The site includes two production wells, two reinjection wells, a heat distribution centre and a 17 km heat transfer network.  

The project was funded in part by a $21m loan from the Hungarian Export-Import Bank.

Around 60% of the plant’s heat will be supplied to an Audi automobile factory in Gyor for use on-site, with the remainder going to around 2500 households and 1000 industrial customers.

The plant is expected to cut greenhouse gas emissions by 67,000 tonnes per year, and to reduce the use of natural gas by 35 million tonnes.

 

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...