Gasification for on-site power

A Tennessee, US waste water treatment plant is to be powered with an on-site gasification facility and an Organic Rankine Cycle (ORC) engine.

Located in Lebanon, near Nashville, thousands of tons of sewage sludge, used tires and industrial wood waste will be processed there each year. Output from the plant, which will process 64 tonnes of material a day, will be used to power a 200 kWe ORC.

PHG Energy of Nashville is designing and building the new facility, including the world’s largest downdraft gasification unit, the company says.

Tom Doherty, Environmental Specialist with the Tennessee, Department of Environment and Conservation (TDEC), said: ‘One of the most exciting parts of deploying this technology in Lebanon is that hundreds or tons of scrap tires will be put to beneficial use while saving Wilson County a considerable portion of their previous disposal expense.’

TDEC awarded the project grant funding of $250,000 and facilitated a subsidy of 70% of the $3.5 million financing’s interest cost.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...