On-site solar for Staten Island church

A 386 kW solar array has been installed above a 17,000 square-foot parking structure at the Church at the Gateway in Staten Island, New York, US.

Developed by IGS Solar, LLC, in partnership with Advanced Solar Products (ASP), IGS financed, owns, and operates the solar project.

The system, which includes 1290 solar panels, is expected to generate over 500,000 kWh per year for the church, and will produce enough electricity to meet 80% of the facility’s power needs.

Rev. Tim Mercaldo, senior pastor of Church at the Gateway, said: ‘Using clean energy and being environmentally responsible were important goals of our church. Our entire congregation is very pleased with the project.’

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...