Jordanian prince backs on-site solar

Al Manal Palace, home to Prince Muhammad bin Talal, brother of King Hussein I of Jordan, is now also home to a 162 kW on-site solar PV project, the largest such installation in the country and the region.

Covering a south-facing hillside within the vast Amman estate, Germany’s Global Renewable Energy Systems LLC designed and installed the system, which features Realforce Power PV modules and KACO inverters.

Commenting, Zouhair Kefi, Managing Director of KACO new energy Dubai, said: ‘Precisely in a region where oil wealth did not bring good fortune, the PV array on the Al Manal Palace is serving as an example to show that a prosperous future can be attained just as well with renewable energy.’

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...