Allerton EfW plant backed by UK’s GIB

A new energy from waste (EfW)plant to be located in North Yorkshire in the UK has won the backing of the Green Investment Bank (GIB) with a £33 million investment.

The project is expected to process up to 320,000 tonnes of household, commercial and industrial waste per year, divert more than 7 million tonnes of waste from landfill over its lifetime.
Allerton EfW  

Being developed by North Yorkshire County Council and City of York Council alongside sponsors AmeyCespa, Aberdeen UK Infrastructure Partners (a fund managed by Aberdeen Asset Management) and Equitix, the plant will generate some 203 GWh of electricity per year.  In addition, an onsite anaerobic digestion plant to treat organic waste will generate around 8 GWh per year.

The new facility in Allerton, between Harrogate and York, will be constructed at an existing landfill and quarry site by contractor AmeyCespa, which will also operate the plant on completion. The project will also reportedly have the capability to be reconfigured to combined heat and power (CHP) ‘if a suitable market can be established’.

GIB will provide long-term loan financing and an equity bridge loan alongside Nord/LB, Sumitomo Mitsui Banking Corporation, Siemens Bank, KfW-IPEX and the European Investment Bank (EIB).  This is the first joint-investment between GIB and EIB. The councils secured a combined investment of more than £183 million towards the proposed project with the EIB providing £150 million. The total project value is £319.5 million.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...