Weltec begins constructing French biogas plant

Weltec Biopower has begun building a 526-kW biogas plant in Saint-Nicolas-du-Tertre, Brittany, about 60 miles northwest of Nantes, France.

The bio-fuels being used are for the purposes of providing heat and power and the plant is to be commissioned in October 2012.

Weltec Biogas

At present, several biogas plants with an output range from 150 to 250 kW, about 600 kW, and about 1 MW are being constructed and planned in cooperation with Weltec Biopower.

For more on-site renewable power news



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...