Canadian sewage gas CHP project to go live

The Greater Nanaimo Pollution Control Centre is set to begin supplying energy to British Columbia’s energy grid within the next two months.

The C$2.95m ($2.98m) cogeneration project generating electricity from waste gases at a sewage treatment plant is one of the first of its kind in Canada at a facility of its size.

Completing the cogeneration project coincides with the construction of a new $7.8m digester at the facility, adding to two digesters already operating at the site.

The facility is expected to produce about 335 kW of power from sewage gas, enough for more than 300 homes.

The facility uses a chemically enhanced primary process to remove sufficient solids (sludge) to meet effluent criteria.

The sludge generated from the wastewater at the facility produces biogas – about 60% methane and 40% carbon dioxide – which had been used to fuel boilers and heat buildings only at the site, while the excess was flared in a waste gas burner.

For more North America news click here

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...