Dow opts for CHP at Brazil factory site

Brazilian biomass developer Energias Renovaveis do Brasil (ERB) is set to invest up to US$1.3 billion to build an on-site cogeneration plants across Brazil.

The company is currently building a CHP plant that will provide electricity and thermal energy for Dow Chemical’s Aratu Complex factory in Bahia state.

ERB has planted 1200 hectares of trees at Aratu since May out of a planned 8000 hectares to provide fuel, and the plant will go into operation by the end of 2012.

The factory will be the first petrochemical facility powered by wood, mainly from eucalyptus trees, in Brazil.

The $190 million project will generate 13 MW of electricity and another 100 MW of thermal energy that will generate process steam.

Dow says that switching to biomass will let the chemical company save 200,000 m3 of natural gas a day.

The Aratu factory makes materials for automotive, building and industrial applications.

For more Cogeneration/CHP news click here.

For more On-Site Renewables news click here.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...