US steel producer's cogen plans put on hold

Air Products and Chemicals has suspended its plans for a cogeneration facility in Middletown, Ohio, US, due to rising construction costs and delays in federal regulatory issues.

The project, which is described as the first-of-its-kind in North America, would have captured the waste gas from the blast furnace at AK Steel’s Middletown plant and turned it into steam and electricity to power the plant.

The Middletown cogeneration facility would have used combined-cycle gas turbine technology.

Air Products blamed the suspension on the slow growth in the US industrial economy causing the costs of constructing the project to grow over time.

AK Steel says it remains a potential project, and a great one for energy and the environment, while adding that it does not make economic sense to continue with the project in the current economic environment.

The project had received a draft air permit from the Ohio Environmental Protection Agency in March of this year.

 For more Cogeneration/CHP news click here.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Maximizing Operational Excellence

In a recent survey conducted by PennEnergy Research, 70% of surveyed energy industry professional...

Leveraging the Power of Information in the Energy Industry

Information Governance is about more than compliance. It’s about using your information to drive ...

Reduce Engineering Project Complexity

Engineering document management presents unique and complex challenges. A solution based in Enter...

Revolutionizing Asset Management in the Electric Power Industry

With the arrival of the Industrial Internet of Things, data is growing and becoming more accessib...