On-site micro-hydro scheme for UK stone company

Forest Pennant, a natural stone company based in the Forest of Dean, Gloucestershire, UK, is celebrating the switch-on of its on-site micro-hydro generation turbine.
 
Harnessing the power of the River Lyd, the turbine installation will produce around 50 MWh of electricity over a 12 month period, meeting more than a third of the company’s usage.
 
Using a crossflow turbine from Ossberger, Forest Pennant will generate around 12 kW of power: at maximum flow rate - 200 litres of water passes over and through the guide vanes per second.
 
The electricity generated by the hydro turbine is fed into the distribution network of the stoneworks and any surplus is exported to the national grid.
 
Forest Pennant managing director, Nick Horton, estimates that the net contribution to the company, when the government feed-in tariff has been added, will be in the region of £15,000 (US$24,000) per annum.
 
For more On-Site Power news.

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...