10-minute tap removal systems

You can retire and remove steel service tees with this new TM (ten-minute) Tap Removal System.


It’s designed to accomplish projects by one worker in nine easy steps using a minimal amount of tools and labor for maximum efficiency.
TM handles clamped-on or welded-on steel service tees in a gas distribution system under no-blow conditions. It enables field personnel to remove potential excavation obstacles and return pipe to near original condition, declares the manufacturer.
Tools included with the system are a way to control gas flow, remove the cutter, and plug the cutter hole in a no-blow situation.
TM has been tested by the Gas Technology Institute. The tool is designed by a certified API 1104 welder and AWS certified welding inspector. Full details are free.
Mesabi Pipeline Products Incorporated
6 SE 1st Street, Chisholm MN 55719



Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...