Upgrade path for A-B PLC-5 controller saves replacement costs

Save a reported 70% of Allen-Bradley PLC-5 turbomachinery control replacement costs with a newly developed upgrade path. It replaces the old processor/co-processor bundle with a current technology processor, then moves the legacy system code to the new processor. The rest of the A-B PLC-5 system is unchanged — and future ready.

Besides improved communications with the new processor, the system can now be upgraded incrementally over time on your schedule. The entire legacy functionality is moved to the new processor application — written in IEC1131-3 international programming standard languages. Additional upgrade path specifics are yours free.

Petrotech Incorporated
7240 Brittmoore Road, Suite 115, Houston TX 77041-3223

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...

Did You Like this Article? Get All the Energy Industry News Delivered to Your Inbox

Subscribe to an email newsletter today at no cost and receive the latest news and information.

 Subscribe Now

Whitepapers

Logistics Risk Management in the Transformer Industry

Transformers often are shipped thousands of miles, involving multiple handoffs,and more than a do...

Secrets of Barco UniSee Mount Revealed

Last year Barco introduced UniSee, a revolutionary large-scale visualization platform designed to...

The Time is Right for Optimum Reliability: Capital-Intensive Industries and Asset Performance Management

Imagine a plant that is no longer at risk of a random shutdown. Imagine not worrying about losing...

Going Digital: The New Normal in Oil & Gas

In this whitepaper you will learn how Keystone Engineering, ONGC, and Saipem are using software t...